The 2026-09-11 decisions replaced nRF54L15 with ESP32-H2 as the Air first-version recommendation, the CR2450 cell with two series AAA primary lithium cells, the 400 mAh comparison budget with 750 mAh, and the ≤12 mm thickness target with ≤14 mm. The specifications under product/switch/ carry the new figures, but the governing documents still carry the old ones:

  • PRODUCT-PLAN.md §P5, row 无线推荐: "nRF54L15 主推荐"
  • PRODUCT-PLAN.md §P5, row 外形/环境目标: "总厚度 ≤12 mm"
  • PRODUCT-PLAN.md §6 item 4: "Air 推荐 nRF54L15 BLE"
  • OPEN-QUESTIONS.md P5 AIR-O-03: "Air nRF54L15、Air Hub STM32G0B1CE + nRF54L15 为推荐" (the Air Hub also moved to Linux ARMv7 + 2×ESP32-C6)
  • OPEN-QUESTIONS.md P5 AIR-O-05/AIR-O-07: "CR2450 可更换 … 400 mAh 是预算假设"

Found while consolidating the Switch product line (20260912-0903); left untouched there because it is a content correction outside that task's approved scope.

Acceptance: the governing figures match the specifications, or the difference is stated as deliberate; bun run docs:build and git diff --check pass.

Reconciling the governing Air figures with the 2026-09-11 platform and battery decisions.

  • blocked by: (none)
  • blocks: (none)
  • Level-1 values are already correct; this is a Level-0 governance sync, not a product decision.

  • complete: product-plan.md P5 and section 6 and open-questions.md AIR-O-03/05/07 now carry the 2026-09-11 figures.